www.archive-org-2013.com » ORG » I » I5WILSONVILLEROAD

Choose link from "Titles, links and description words view":

Or switch to "Titles and links view".

    Archived pages: 9 . Archive date: 2013-08.

  • Title: Wilsonville Road Interchange Project
    Descriptive info: .. Home.. Background.. Bicycle & Pedestrian Improvements.. Public Meetings /.. Get Involved.. Project Newsletters.. Reports / Maps.. I-5 Auxiliary Lane Project.. Interchange Area Management Plan.. Contact Info.. Back to Oregon Dept.. of Transportation website.. Back to City of Wilsonville website.. WILSONVILLE ROAD INTERCHANGE.. For the Latest Construction News.. ODOT will post weekly updates during the construction period.. Click below to go directly to this link.. http://www.. oregon.. gov/ODOT/HWY/REGION1/WeeklyUpdate.. shtml#wilsonville.. Project Description.. ODOT and the City of Wilsonville are ready to begin work on the I-5/Wilsonville Road Interchange Project, which will improve traffic flow and safety in the interchange area.. Project elements include:.. Converting Wilsonville Road from six lanes to eight lanes (two travel lanes and two left-turn lanes in each direction) within the interchange area Improving safety and capacity of the I-5 ramps Landscaping selected sections of the interchange Enhancing sidewalks and bike lanes Installing new street lights and decorative railing.. Project Status.. ODOT has selected Kerr Contractors Inc.. of Woodburn as the prime contractor for the project.. Kerr will begin work the first week in January 2011.. Nearby residents will notice construction signs in the project area beginning in December 2010.. Kerr will complete all work by November  ...   work will also take place, but it will be off the roadway and will not block traffic.. Additionally, if the contractor elects to do weekend work, they are restricted to nighttime hours for any work requiring lane closures.. During the course of the project there may be temporary closures of the I-5 on- and off-ramps.. In these cases, we will not close ramps in both directions at the same time.. Nighttime Construction.. Nighttime construction noise may be audible to residents along the project corridor.. However, noise levels dissipate as distance from the source increases.. To report noise issues during nighttime work hours only, please call (503) 412-2351.. For questions or concerns during daytime work hours, please call (503) 731-8237 or email Ellizabeth Craig at elizabeth.. craig@odot.. state.. or.. us.. Parkway Avenue Closure.. With the widening of the I-5 northbound off-ramp and Wilsonville Road, turning movements onto Parkway Avenue will no longer be safe.. As a result, Parkway Avenue will be permanently closed and traffic will be routed one block over to the signal-controlled intersection at Town Center Loop West.. For more information, contact:.. Kimberly Dinwiddie, Community Affairs Coordinator.. Oregon Department of Transportation - Region 1.. 503-731-8281.. kimberly.. dinwiddie (at) odot..

    Original link path: /
    Open archive

  • Title: Wilsonville Road Interchange Project -
    Descriptive info: I-5/Wilsonville Road Interchange Improvements.. The I-5/Wilsonville Road Interchange.. The Oregon Department of Transportation and the City of Wilsonville have designed a project to manage this busy freeway interchange.. In its current condition, the interchange area experiences daily traffic backups due to insufficient ramp lengths and lane configurations.. During peak traffic periods, vehicle backups extend onto I-5 creating a significant safety hazard.. Without improvements, these conditions are expected to increase in the future.. Where is this project?.. Click here.. for a map of the project area.. What are the project goals?.. This project will improve traffic flow on Wilsonville Road and the interchange ramps and provide greater capacity.. The primary goals of the project are to:.. Maintain safe and efficient operations of I-5 and Wilsonville Road by improving capacity and alleviating vehicle backups and other safety concerns;.. Create high-quality bicycle and pedestrian passage through the interchange area; and.. Improve the streetscape along Wilsonville Road.. What is happening at the Parkway Avenue intersection?.. As part of this improvement project, steps are being taken to improve safety  ...   basis until this subsequent phase of interchange improvements when the intersection would be fully closed per the access control plan.. Due to the widening of the I-5 northbound off ramp and Wilsonville Road as part of the current project, the remaining turning movements into Parkway will no longer be safe.. A cul-de-sac at the end of Parkway Avenue near Wilsonville Road will be constructed.. Parkway Avenue is scheduled to be closed as early as Jan.. 6, 2011.. What was included in the design phase?.. This project design phase was complete in summer 2010.. Design work included:.. Surveying.. Environmental services.. Pavement design.. Traffic analysis.. Hydrological/hydraulic analysis.. Geotechnical services.. Roadway design.. Structure design.. Landscape design.. Identification of ROW impacts.. Utility coordination.. Public involvement.. What is the anticipated schedule?.. Spring 2010: Project design activities completed.. Fall 2010: Contractor bidding and selection.. Winter 2011: Construction start.. Summer 2012: Construction complete.. How much will this project cost?.. The estimated cost of this project is $21.. 5 million.. Elizabeth Craig, Community Affairs Coordinator.. (503) 731-8237.. elizabeth.. craig (at) odot.. us..

    Original link path: /Background.php
    Open archive

  • Title: Wilsonville Road Interchange Project -
    Descriptive info: Beauty the Bridge: Wilsonville Road Bicycle Pedestrian Enhancements.. The Wilsonville City Council recognized the critical need for better community walking and bicycling connections on Wilsonville Road and dedicated funds to create the Beauty and the Bridge project.. The goals are to connect Wilsonville with:.. A safe east/west bicycle and pedestrian crossing under I-5.. An inviting, comfortable, and aesthetically pleasing environment to improve mobility and encourage bicycling and walking.. A school-based process that involves students in design, creation, and production of public art along the  ...   them not only today to a unique civic and educational experience but also to Wilsonville for years to come.. For more information, please visit the Beauty and the Bridge table.. at the January 5, 2011 open house for the I-5 Wilsonville Interchange Project, or visit.. www.. ridesmart.. com.. Wilsonville Road Interchange.. Section Between Bridges.. (Click here for a larger image.. ).. The area under the freeway will feature two travel lanes and two left-turn lanes in each direction, landscaping, and enhanced sidewalks and bikelanes..

    Original link path: /BikePed.php
    Open archive

  • Title: Wilsonville Road Interchange Project -
    Descriptive info: Upcoming Events.. There are currently no upcoming events for this project.. Past Events.. Open House: January 5, 2011.. An Open House was held on January 5, 2011 at Wilsonville City Hall to update the public on the construction schedule and traffic impacts.. Open House: October 27, 2009.. An Open House was held on October 27, 2009, at Wilsonville  ...   Open House was held on February 4th, 2009, at Wilsonville City Hall Council Chambers to educate the public about interchange management at the I-5/Wilsonville Road Interchange.. for a summary of the Open House.. Attachments for the Open House summary are available here:.. Public Comments Appendix.. Project Fact Sheet.. Open House Program.. Open House Announcement.. Project Area Conceptual Layout..

    Original link path: /Info.php
    Open archive

  • Title: Wilsonville Road Interchange Project -
    Descriptive info: Project Newsletters.. Check back for project newsletters as they become available.. for a project factsheet..

    Original link path: /Newsletters.php
    Open archive

  • Title: Wilsonville Road Interchange Project -
    Descriptive info: Reference Maps, Photos and Reports.. The Wilsonville I-5 Interchange Area Management Plan is now available.. Click on the links below to download the report.. Please note that file sizes are large and download may take several minutes.. Interchange Area Management Plan Document.. [PDF, 14.. 6 MB].. Appendices.. [PDF, 32.. 8 MB].. Project Layout..  ...   Design.. for a rendition of the under-bridge proposed changes at the I-5/Wilsonville Road interchange.. Updated 01/04/2011.. Landscape Opportunities.. for an overview of potential landscaping design possibilities and pedestrian amenities to the I-5/Wilsonville Road Interchange.. Updated 10/07/2009.. for a brief fact sheet on Wilsonville Road projects, including project descriptions, tentative timelines and contact information..

    Original link path: /Report.php
    Open archive

  • Title: Wilsonville Road Interchange Project -
    Descriptive info: I-5 AUXILIARY LANE PROJECT.. This summer construction will start on a project to add an additional lane on I 5 northbound from the Elligsen Road interchange to I 205 northbound.. With this addition, two lanes on I 5 northbound will exit onto I 205.. In addition to building the auxiliary lane, the project will:.. Widen shoulders on I 5.. Remove noxious weeds and improve landscaping.. Improve drainage and stormwater management.. Replace substandard guardrail.. Upgrade signs.. Protect nearby wetlands.. Starting in January 2011,  ...   replant trees once the project is complete.. Removing trees is necessary to widen I 5.. Some of the trees are hazardous, posing a safety threat to drivers traveling on I 5.. Contact information.. For more information on the I-5 Auxiliary Lane Project, please contact:.. Kimberly Dinwiddie, ODOT Community Affairs.. (503) 731 8281.. Click here to visit the project website.. Information about this project will also be available at the January 5, 2011 open house for the I 5 Wilsonville Road Interchange Project..

    Original link path: /AuxiliaryLaneProject.php
    Open archive

  • Title: Wilsonville Road Interchange Project -
    Descriptive info: INTERCHANGE AREA MANAGEMENT PLAN.. The City of Wilsonville is working on an Interchange Area Management Plan - or IAMP - for the I-5/Wilsonville Road interchange.. The purpose of the IAMP is to protect the function of the interchange and the state's investment.. while providing capacity for current comprehensive plan land uses.. It considers both land use and transportation facilities for a 20 year period.. The I-5/Wilsonville interchange is at capacity today, and experiences heavy traffic delays.. Some of the main problems are:.. I-5 Northbound exit ramp routinely queues back to mainline freeway during AM peak period.. Short off-ramp length and  ...   Eastbound vehicles queue toward the west in AM peak period (sometimes past railroad tracks).. Westbound vehicles queue toward the east in PM peak period (to Rebekah Street and sometimes to Town Center Loop East).. for information on the IAMP process, a map of traffic issues, and the proposed study area for the project.. Tentative Project Timeline.. Summer 2009: Draft IAMP Completed.. Fall 2009: Adoption Process.. Winter 2009-10: Adoption Complete by City of Wilsonville.. and Oregon Transportation Commission.. For more information on the I-5/Wilsonville Interchange Area Management Plan, please contact:.. Scott Mansur, P.. E.. , DKS Associates.. (503) 391-8773.. smm (at) dksassociates..

    Original link path: /IAMP.php
    Open archive

  • Title: Wilsonville Road Interchange Project -
    Descriptive info: For more information please contact:.. Kimberly Dinwiddie.. Community Affairs Coordinator.. Oregon Department of Transportation..

    Original link path: /Contact.php
    Open archive





  • Archived pages: 9